Liquidity framework checked 8 October 2026
The FSB’s final recommendations on margin and collateral preparedness focus on governance, stress scenarios and collateral management for non-bank participants. The report was published in December 2024 and remains a relevant primary framework; it is not a claim that a new rule was issued this week. FSB final report.
The distinction matters in the source’s commodity examples: a hedge can reduce economic exposure while producing cash margin calls before physical receipts arrive. Test the timing of available liquidity against a joint price, basis and haircut shock. Do not assume that a favourable eventual commercial cash flow can pay an earlier variation-margin call. Original prices, margin paths and basis examples below remain explicitly educational inputs.
A commodity hedge can offset much of the benchmark-price move and still leave the hedger with a serious economic loss or cash shortage. The physical price may diverge from the futures benchmark, the hedge may mature at the wrong time, or margin must be paid before the offsetting commercial cash flow arrives. These risks require their own measurements and resources.
Reference report · No directional market call
This report integrates the advanced futures discussion and practical chart guide around implementation. Numerical examples are educational inputs retained from the material. Historical episodes mentioned in the sources motivate the risk mechanisms; unverified company-level loss claims and identifying details are not reproduced as established evidence.
Define basis with a sign convention
Let denote the physical spot price at time and the relevant futures price. Define basis as . Some desks use the opposite sign, which is equally workable if every calculation follows it.
For one physical unit hedged by one short futures-equivalent unit, the price-component change is:
Thus a nominally complete linear hedge converts benchmark-price exposure into basis exposure. If the asset and contract truly converge on the same deliverable terms at maturity, that can reduce uncertainty considerably. If they differ in location, grade, currency or timing, the remaining basis can be economically large.
Sources of basis divergence
| Basis component | Source of divergence | Information needed |
|---|---|---|
| Location | Transport bottlenecks and local shortages | Delivered prices, transport costs, capacity |
| Quality | Grade or specification differs | Quality differentials and substitution limits |
| Timing | Purchase date and contract expiry differ | Forward curve and actual delivery schedule |
| Currency | Physical and hedge prices use different currencies | Consistent conversion and FX exposure |
| Processing margin | Input/output relationships change | Yield, product mix and separate product curves |
The label “same commodity” does not establish equivalence across these dimensions.
Figure 01 · Qualitative comparison
The basis left after a benchmark hedge
| Mismatch | Physical exposure | What the hedge may miss |
|---|---|---|
| Location | Delivered commodity at the required site | Local transport constraints or shortages |
| Grade | Specific quality or specification | Premium or discount to the benchmark grade |
| Timing | Commercial delivery and payment date | Futures expiry and rollover requirements |
| Currency | Currency of the actual cost or receipt | Exchange-rate movement outside the futures leg |
Local shortages can overwhelm benchmark protection
The retained local-gas price scenario
| Comparison | Retained observation |
|---|---|
| Initial price | An advanced teaching scenario describes gas initially priced at $4.35 per energy unit, consisting of a $3.50 benchmark plus $0.85 local basis. |
| Stress price | In a stress, the benchmark is $6 and local basis is $15, making the delivered price $21. |
| Price increase | The physical price increase is therefore $16.65, while the change attributable to local basis is $14.15. |
The source separately states a benchmark move from $4 to $6 when calculating the hedge gain, despite its initial delivered-price arithmetic using $3.50. These are inconsistent starting benchmarks. It also quotes volume in billion cubic feet while multiplying directly by prices per million thermal units, without a documented heat-content conversion. Consequently, the published scenario retains the price inputs but does not present its aggregate $296.6 million loss as a reconciled result.
A transparent per-unit reconstruction can state either baseline explicitly. If the hedge starts at $4 and gains $2 with a 0.91 ratio, the gain is $1.82 per matched energy unit. Against a physical increase of $16.65, residual cost is $14.83 per unit before other costs. If the futures baseline is $3.50, the gain is $2.275 and residual cost is $14.375. Aggregate exposure requires a valid quantity conversion.
The lesson survives the arithmetic conflict: most of this stress is local basis, and a national benchmark hedge cannot be credited with covering it. That conclusion is stronger when the units and starting prices are explicit.
Forward curves encode carry and scarcity
A simplified cost-of-carry representation is:
Here is maturity, financing rate, storage and related carry cost, and convenience yield, representing the benefit of holding physical inventory. The formula is a model whose applicability depends on storage, financing and arbitrage constraints.
Contango means longer-dated contracts are above nearer prices for the curve segment being discussed; backwardation means the reverse. A curve can change shape across maturities. Neither term alone establishes the realised cost or profit of a complete hedge because that also depends on trade direction, entry levels, convergence and what the physical position earns or pays.
The retained contango teaching curve
| Comparison | Retained observation |
|---|---|
| Spot | The sources use simple curves such as spot $80, |
| First maturity | first maturity $82 |
| Second maturity | and second maturity $84 to illustrate contango. |
For a long rolling position, moving from a lower-priced expiring contract to a higher-priced deferred contract can create adverse carry under an otherwise stable curve. For a short position the corresponding directional effect differs. It is therefore incorrect to describe contango as a universal cost to every hedger.
A roll is a transition between exposures
A roll closes one contract and opens another. The price difference at execution is informative, but it is not a standalone cash loss identical to buying a physical asset at a higher price: futures require margin rather than full payment of notional. Realised hedge economics emerge from the old contract’s profit or loss, the new exposure, subsequent price evolution and financing.
Record the old and new maturities, quantities, execution prices, bid-ask costs and exposure dates. Determine whether the replacement contract actually matches the remaining physical requirement. A calendar-spread trade can reduce legging risk, but it cannot eliminate curve changes or physical mismatch.
Repeated short-maturity hedges against a long commercial obligation create rollover risk. The future hedge cost is not fixed at inception. A long-dated forward or swap may better align dates but introduces different liquidity, credit, collateral and pricing considerations. Selection requires the full economic comparison rather than assuming one format is universally cheaper.
Figure 02 · Conceptual framework
The margin clock can run ahead of the commercial clock
How the parts connect
- Commodity price risesimmediate cash demandFutures cash loss
- Commodity price riseslater commercial benefitHigher physical proceeds
- Futures cash lossrequires fundingFunding gap
- Higher physical proceedsarrives with a delayFunding gap
- Funding gapsize the reserveLiquidity stress
Daily settlement can turn an economic hedge into a funding problem
Suppose a producer shorts futures to protect the value of later production. A price rise creates futures losses requiring cash margin, while the commercial offset arrives only when production is sold. The combined eventual economics may remain acceptable, yet the organisation can run out of usable cash before receiving the offset.
For a consumer with a long futures hedge, a price fall can create the analogous margin requirement while future purchases become cheaper. The favourable commercial effect cannot necessarily be borrowed against quickly or cheaply.
A liquidity stress should therefore calculate the path of cumulative margin and collateral requirements, not only terminal profit and loss. Include initial-margin increases, intraday calls, collateral eligibility, settlement timing, concentration limits and the availability of funding under stress. A credit line should be assessed for whether it remains drawable precisely when the hedge needs it.
Measure the whole hedge, not the derivative alone
Use a consistent exposure window and distinguish at least five components: physical value or cash-flow change, derivative profit and loss, basis change, implementation and financing costs, and any volume or timing change. Accounting presentation can differ from economic offset; explain that difference rather than calling every derivative loss a hedge failure.
A processor selling output futures while buying input futures may report losses on one leg during a favourable expansion in processing margins. That fact alone does not show a defective hedge. The combined physical and derivative margin must be compared with the protected target. Similarly, a gain on a short hedge during a price collapse may coincide with damaged demand or lower production outside the hedge’s scope.
Figure 03 · Conceptual framework
A futures roll changes the exposure, not just the quoted price
How the parts connect
- Remaining physical needretire expiring exposureClose old future
- Remaining physical needreplace future protectionOpen replacement
- Close old futureold contract resultCombined hedge result
- Open replacementnew exposure evolvesCombined hedge result
- Execution and fundingdeduct actual costsCombined hedge result
Use several effectiveness measures
Variance reduction is useful but symmetric: it treats unusually positive and negative outcomes as dispersion. A solvency-sensitive hedger also needs downside measures and liquidity requirements. Expected shortfall measures average loss beyond a specified tail threshold under a defined distribution or empirical sample.
The teaching example reduces expected shortfall from $50 million to $15 million. The reduction is . This says nothing about whether margin can be funded along the path, whether the estimate is stable, or whether the remaining $15 million is within tolerance.
What each hedge-effectiveness measure reveals
| Measure | What it reveals | What it does not establish |
|---|---|---|
| Variance reduction | Compression of overall dispersion | Protection in every crisis |
| Expected-shortfall reduction | Improvement in the specified loss tail | Certainty about unobserved tails |
| Maximum drawdown | Severity of path deterioration in a sample | A future worst-case limit |
| Peak funding need | Cash required along a scenario path | Availability of that cash |
| Cost per risk reduction | Economic efficiency under a defined metric | Suitability for every mandate |
A small historical sample has little information about very rare tails. Stress scenarios complement statistical estimates; they do not become calibrated probabilities merely by appearing in a dashboard.
Build a decision-oriented hedge dashboard
The chart material proposes monitoring basis, curves, rolling dependence, hedge ratios and profit-and-loss distributions together. A practical implementation should keep time series in consistent units and use the same observation windows. A chart of prices on incompatible scales can create a visual relationship that disappears in returns or converted values.
Set alerts around decisions. A deteriorating relationship may trigger reduced proxy use, a review of delivery terms or an additional local hedge. A rising margin forecast may trigger a funding action before the next call. A threshold should be tied to tolerance, statistical uncertainty and the cost of a false alarm, not copied from an unrelated example.
Do not calculate “effective hedged percentage” by multiplying a quantity hedge ratio by correlation and present it as a universal risk measure. Variance reduction depends on the entire covariance structure and the chosen ratio. Use the actual combined profit-and-loss distribution for the stated exposure.
Test the response when the hedge must be changed
A stress test should include the cost of adapting the hedge, not only its value before adaptation. If local basis widens, the more specific replacement instrument may also become less liquid. If a contract must be rolled during a funding squeeze, market depth and collateral terms may worsen together. Assuming normal execution costs throughout the stress can understate the resources required.
Use a trade-capacity assumption: how much can be changed within a day or week without excessive impact? Link that to the exposure’s rate of change. An overnight jump cannot be neutralised by a policy that assumes continuous trading at the last observed price. A funding line or an option held in advance addresses a different problem from a promise to rebalance later.
After the event, reconcile forecast and realised basis, execution and funding costs. A derivative may have behaved exactly as specified while the commercial exposure differed from the forecast. That diagnosis points to better exposure modelling; blaming the instrument would miss the source of the error.
A complete hedge is an economic and liquidity plan
The decision process begins with the commercial exposure, maps the exact basis differences, chooses maturities, sizes positions and allocates funding. It then tests both terminal outcomes and paths that are difficult to finance. The objective is to maintain the protected economic activity through the stress, not merely produce an attractive derivative backtest.
Correct directional intuition is insufficient because basis, timing and liquidity can move independently of the benchmark view. Treating these as explicit risks produces a hedge whose limitations can be understood before an adverse event reveals them.